Details: earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. cement concrete 1:4:8 (one cement, four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification providing and laying in position standardised concrete mix m-20 grade in accordance with is 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all rcc items of works with minimum cement contenet of 32
Sector: RDPR