Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 plain cement concrete 1:4:8 (one part of cement, four part of crushed stone sand (m- sand) and eight part of coarse aggregates) using 40mm size iss hbg metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification supplying and erecting centering for vertical plain/ rcc concrete walls of supply channel, retaining wall etc upto 90cm height with necessary supports,all
Sector: RDPR