Details: dismantling , removing and carefully stacking pressed tiles with weather course etc., complete complying with standard specification and as directed by the departmental officers at site of work. dismantling the damaged brick work in cement mortar under 3m height and clearing away carefully disposal of unserviceable materials to lead of 50m etc complete complying with standard specification and as directed by the departmental officers at site of work. providing two legged scaffolding using 48.30mm dia heavy duty ms pipe over all height of 3.00m the distance between 2 legs being 1.25m and the spacing of the post being 2m in each rows and providing platform with c.w. planks using 40mm thick silver oak and 1.00m wide in complete form with horizontal bracings @ 1.50m c/c vertical direction and with cross bracings using same 48.30mm dia including cutting, threading assembly with red oxide primer, labour charges cost of speicals such on large plate, shoe, carcher, coupling, bolt and nut tr
Sector: PWD