Details: earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.ss 20 b supply and delivery of 150mm gi pipes as per is specification including loading, unloading, freight stacking, conveyance to the work site etc., complete lowering the150mmgii pipes and specials to trench and laying to proper grade and alignment as per standard specifications refilling with excavated earth other than sand including all cost and conveyance of material and labour charges etc complete supply and delivery of di d/f gate sluice valves (soft seated) resilient seated soft sealing gate valves (sluice valves) with body bonnet of ductile cast iron ofgrade ggg 40 or equivalent grade, wedge fully rubber lined with epdm replaceable spindle nut without gland packing and with 3 o ring
Sector: RDPR