Details: strenthening road from jayankondapattinam to akkarai kizhakku road r - 337 clearing and scrub/ light jungle by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness including cutting of trees up to 300mm girth picking the existing black top/ wbm surface to 50 mm depth including labour, hire charges d plants and all other incidental charges etc. complete as per most specification. earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10m and lift of 2m including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out providing us gravel with a lead of km including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc k
Sector: RDPR