Details: earth work excavation for foundation in all types of soils and sub soils to full depth (such as soils in rock / silt / light black cotton soil / ordinary soil ) except in rock requiring blasting but inclusive of shoring, shuttering and bailing out water wherever necessary and refilling the sides of foundation with excavated earth other than sand in layers of 150 mm thick well rammed and consolidated, depositing the surplus earth in places shown by the departmental officers with initial lead of 10 m and initial lift of 2 m. complete as per tnss 23 & 24, v, vi (s2), vii, 9,10 providing 300mm dia pile by hand driven machineries including cost and conveyance of all materials and all labour charges for hire and fuel changes for machineries etc., complete excluding rcc and reinforcement etc., complete as per standard specifications supplying and filling in foundation and basement with crushed stone sand (m- sand) in layers of not more than 15cm thick well rammed watered and compacted etc.,
Sector: RDPR