Details: earth work excavation in all classes of soils and sub soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering , bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officerswith an initial lead of 10mts and initial lift of 2mts and clearing and levelling the site etc, complete complying with standard specification. ( tnss no or nbc no 23,24, v,vi s2) cement concrete of mix 1 : 4 : 8 (one cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete a
Sector: RDPR