Details: dismantling, clearing away and carefully stacking materials useful for re-use for pressed tiles & weathering course etc dismantling, clearing away and carefully stacking materials useful for re-use for rcc etc dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls brick / stone masonry in cement mortar walls under 3m high etc earthwork excavation for foundation to full depth in all soils and sub soils to full depth as may be directed except in rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15 cm thick well rammed and consolidated depositing the surplus earth within the compound in places shown by the executive engineer with initial lead and lift and leveling the same etc., complete complying with standard specification and drawings. s&f crushed stone sand gravel mix (1:1) in foundation & basements
Sector: PWD