Details: earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. supplying and filling in foundation and basement with filling m sand in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification cement concrete 1:4:8 mix using 40 mm hbg metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. compacting etc., complete complying with standard specifications and as directed. r.c.c 1:1.5:3 using 20 mm iss hbg metal for all rcc item of works excluding cost of reinforcement curing and providing fixtures like fan clamps in the rcc floor or roof slabs and all others etc., completesub structure columns r.c.c 1:1.5:3 using 20 mm iss hbg metal for all rcc item of works excluding cost of reinforcement curing and providing fixtures like fan clamps in the r
Sector: RDPR