Details: earthwork excavation in all soils and subsoils except hard rock requiring blasting with initial lead and lift as initial lead of 10.0 m and lift 0f 2.00 m including re-filling the sides of foundation in layer of 15cm. thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification. plain cement concrete 1:4:8 [one cement, four m-sand and eight course aggregates] using 40mm size hard broken/machine crushed granite stone jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification. supplying and erecting centering for soffits of plane surfaces like rcc slabs, lintels, sunshades, square columns, staircase waists, beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm and bg 10 stiffened with m.s angles of size 25mm x 25mm x 3mm laid over silver oak (c.w) joists of s
Sector: Municipality