Details: operation and comprehensive maintenance of the passenger ropeway system for one year including manpower and supply of all emergency, all operating spares, and all other equipments and spares except new cabins.(in normal days-minimum 14 hours of operation (morning 06.30 am to 9.00 pm including break hour between 01.30 pm to 02.30 pm) and on festival days and as and when required by the temple - round the clock operation is envisaged). the technical details of the ropeway are attached herewith.1. type of modified ropeway system monocable fixed grip jig back type passenger ropeway system2. name of the present o&m contractor m/s. ropeway & resorts private limited, kolkatta.3. commencement date 02.09.20084. travel length 305 meters5. level difference 130 meters6. cabins capacity 4 passengers7. ropeway capacity 300 pph (persons per hour)8. no.of cabins per side 4 nos.9. ropeway speed 0 – 2.5 mps10. motor power 100 h.p (75 kw)
Sector: Religious building