Details: earth work excavation in all soils and sub soils exceipt hard rock requiring blasting with intial lead and lift including re-filling the sides of foundation in layers of 15cm thick watering, ramming, depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per ss 20 b tndss no: 23 & 24 vi (s2), vii 9,10 plain cement concrete using 1:4:8 mix (one cement, four sand eight aggregates) using 40mm iss gauge hbg metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, consolidating and curing etc., complete as per standard specification. tndss no: 28 v, vi (s2) v, vi (s5a) vii supply and fabrication and placing in position of tmtsteel roads to required size and length as directed by the departamental officers including cost of binding wire, cutting, bending and tying etc., inclduing cost and conveyance of all materials to side and all labour charges etc., comp
Sector: RDPR