Details: strenthening the road kongarampoondi to melakondai road km 1/300 - 2/650 clearing the scrub jungles including all labour charges for all labour charges etc complete. km 1/300 - 2/650 earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per ss20a including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br km 1/300 - 2/650 picking the existing damaged bt surface km 1/300 - 2/650 collection and supply of us gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete, km 1/300 - 2/638 km 1/300 - 2/650 constructtion of granular sub base by providing well graded material (25mmto 4.75mm irc km 1/300 - 2/638 km 1/300 - 2/650 providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water at omc in
Sector: RDPR