Details: earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.ss 20 b. supply and delivery of 600mm rcc hume pipe np3 including cost and conveyance of all materials to site, loading and unloading charges etc,complete. jointing of 600mm rcc hume pipe including cost and conveyance etc,complete. plain cement concrete 1:4:8 (one cement,four sand and eight aggregate) mix using 40mm gauge hand broken hard granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm well rammed etc., complete complying with standard specifications. supplying and erecting centering for sides and soffits including supports and srtutting upto 3.29mm height for plane surfaces in all floors with cross bracings using miled steel shee
Sector: RDPR