Details: part 1 :strenthening to the road from mangarai main road to ramar temple h/o mangarai estimate amount rs.22.00 lakhs clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders ss .20.a compacting etc., complete complying with std. specifications and as directed. rate for 10 . construction of granular sub base by providing well graded material (25 mm to 4.75 mm irc hbg metal @ 65 %,4.75 to 2.36m
Sector: RDPR