Details: earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders ss .20.a collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications cement concrete 1:4:8 mix using 40mm iss metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 . supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for r c c column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over
Sector: RDPR