Details: picking the existing bt surface upto 50mm thick as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excludung cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc.,complete as per clause 111, 112, 202, 305.4.3 of morth - vth revision etc.,complete. 1) widening from two lane to two lane with paved shoulder and strengthening at km 35/0-35/2, 36/2-37/2 of malliakarai - rasipuram - tiruchengode - erode road including construction of retaining wall at km 36/6-37/2, reconstruction of culvert at km 36/2 (ii), 36/10 2) widening from intermediate lane to two lane and strengthening at km 2/0 - 3/0 of goundam palayam - anaipalayam - pachal road including construction of drain and reconstruction of culvert at km 2/2, 2/4, 2/6, 2/8 earth work excavation in all classes of soil except hard rock not requir
Sector: Road development