Details: earth work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank as per ss20b with all leads and lifts and all other icidental charges such as baling out water shoring shrutting walling and forming protective bunds wherever necessary etc.,comlete as per relavant specification for boxing. as per clause 111, 112, 201, 202, 301 to 305 & 900 of morth vth revision construction of granular sub-base by providing close graded material,mixing in a mechanical mixplant at omc, carriage of mixed material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete for diversion road as per clause 111, 112, 401 & 900 of morth vth revision etc., complete - for grading- v material 1.2) construction of box culvert at km 0/6 dry lean cement concrete sub base - construction of dry lean cement concrete sub base over a prepared sub grade with coarse and fine agg
Sector: Road development