Details: removal of the black topped (bt) surface to 50 to 70mm depth using milling machine, including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental charges etc. complete as per the direction of the departmental officers 1.strengthening at km 205/6 - 206/6 of varanasi - kanyakumari road (abandoned nh7) providing and laying tack coat over existing bt surface using 2 kg of bitumen emulsion (rs1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perclause 111, 112, 501,503 & 900 of morth rev-5 1.strengthening at km 205/6 - 206/6 of varanasi - kanyakumari road (abandoned nh7) providing and laying bituminous concrete to 40mm thick u
Sector: Road development