Details: construction of 60000 ltr oht with pipe line (380m) @ r.gopinathampatti h/o r.gopinathampatti pt., earth work excavation below g.l. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil first depth of 0 to 2 m second depth of 2.0m to 3.0 m sand filling for foundation with clear river sand including cost of sand,watering,ramming and consolidation etc complete as directed by twad board officers for column footing pcc 1:4:8 using 40mm hbg metal including mixing curing etc.,below 1.50 m from gl. for footing rcc in m 30 mix using10mm& 20mm size hbg metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete below 1.5m from gl column footing 0m to 1.50m below gl 0m to 1.00m above gl 1.00m to 4.50m above gl 4.50 m to 7.32 m above gl 7.32 m to 10.98 m above gl 10.98 m to 14.64 m above gl 14.64 m to 18.30 m above gl steel centering, soffits of rcc works including
Sector: RDPR