Details: providing and laying tack coat over existing bt surface using 2 kg of bitumen emulsion (rs1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perclause 503 of morth rev-5 (morth no. 111, 112, 501, 503, 900) providing and laying 50mm thick bituminous macadam using course aggregate and vg30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using mini hot mix plant and power roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 morth rev-5 (for patch works)(morth no. 111, 112, 501, 504, 900, 3004) providing, laying 50mm consolidated thick bituminous macadam using 0.20cum of 26.50-13.20mm,0.43cumof13.20-2.36mm and 0.08cum of 2.36mm & below size irc metal
Sector: Road development