Details: civil work earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per ss 20b for narrow foundation. cement concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. brick work in c.m 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. plastering with cement mortar 1;5, using 12mm thick in all floors etc.,complete. supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (the colour and shade of the distemper shall be got approved by the executive engineer before use of
Sector: RDPR