Details: dismantling clearing away and carefully stacking the materials useful for reuse of any thickness, stacking the debris away from the site in the low lying areas inside the campus) dismantling pcc brick/stone masonry in cement mortar walls earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. (wide excavation) earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders ss.20b, the surplus earth should be rem
Sector: Logistics and warehouses