Details: earthwork open excavation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and depositing the excavated earth within the compound in places shown by departmental officers with an initial lead of 10m and lift of 2m and clearing and leveling etc. complete complying with standard specification. footing grade beam supplying and filling in foundation and basement with crushed stone sand (m-sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.- m sand filling supplying and filling in foundation and basement with well gravel layer not more than 15cm thick well ramped watered and compacted etc,. complete with standard specification plain cement concrete 1:4:8 (one part of cement, four part of crushed stone sand (m- sand) and eight part of coarse aggregates) using 40mm size iss hbg metal inclu
Sector: Municipality