Details: carrying out bathymetry survey in specified survey grids and the rate shall include all labour, materials, tools, plants, equipments, fuel, mobilization and demobilization complete all as per scope of work. port basins (four spells for the period of 2024-25 and 2025-26) (4x285 km) entrance / approach channel (four spells for the period of 2024-25 and 2025-26 ) (4x215 km) dumping site (2 spells post monsoon for the period of 2024-25 and 2025-26) (2x13 km) port limit areas up to shoreline (two spell post monsoon survey for the period of2024-25 and 2025-26 (2x262 km) fishing harbour entrance areas (four spells for the period of 2024-25 and 2025-26. (4x8 km) provisional item: survey at berths and other locations as and when required as instructed by dc including all etc,.complete for the period of 2024-25 and 2025-26 )
Sector: Harbor