Details: rcc road construction earth work for open excavation for road in all soils and sub soils and to full depth as may be directed except hard rock requiring blasting inclusive of shoring, shuttering and baling out water where ever necessary , refilling the sides of foundations with excabvated earth in layers of not more than 15cm thk watered, well rammed , consolidated and depositing the surplus earth on bank with initial lead of 10m and initial lift of 2m, clearing and leveling the site etc., complete as directed by the federation officers and as per standard specifications. providing and laying wet mix macadam base course of 150 mm compacted thickness as specified on the proposed sub base with graded stone aggregate and granular materials of quality size and grading placed in layers as specified including premixing the materials with water at omc in base mix plant and conveyaing the mixed materials to site by tipper, spreading and laying in uniform layers pavers in sub base / base course
Sector: Cooperative Federation