Description: Completion of SDM Residence at Diskit Nubra Name of Work Completion of SDM residence at Diskit Nubra
Details: Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50 meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) Spreading of sludge, dump manure or/and good earth in required thickness as per directions of officer in-charge (cost of sludge, dump manure or/and good earth to be paid separately) Providing and laying of grass lawn including watering and maintenance of the lawn for at least one season or more till the grass forms a thick lawn free from weeds and fit for mowing over 75 mm thik compacted bed of sand, including carriage complete job. Providing and laying 40mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and de
Sector: PWD