Details: removal of silt/clay deposits clearance including disposal lead upto 50 mtr complete earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: all kind of soil 80% ordanary rock 20% dry stone pitching,(any thickness) including cost of stones and preparation of surfacenallah stone . providing and laying in positioncement concert of specified grade excluding the cost of cantering and shuttering. all work up to plinth level 1:4:8 (1: cement: 4coarse sand: 8graded stone agg. 40mm nominal size) nallah. including all carriage complete. centering and shuttering including strutting, propping etc. and removal form for:- walls (any thickness) including attached pilasters buttresses, plinth and string course etc.
Sector: PWD