Description: Repair Replacement of Piping System of Central Heating System at CT Scan Block Name of Work Repair Replacement of Piping System of Central Heating System at CT Scan Block
Details: Repair Replacement of Piping System of Central Heating System at CT Scan Block. PUMPS.p/f Brine circulation Monobloc Pump with 2hp 3 phase size 50x40 mechanical seal with 11lps at 8Mtr. Complete job with starter panel. 01 No. HOT WATER RADIATORS CONFIRMING TO EN442 STANDARDS.Steel panel heating radiators conforming to EN442 standard, working pressure ranging from 10-13 bar having working temperature at 110°C, complete with Top grilles and side covers as standard along with inlet valve, outlet valve, air purge valve and threaded plug as per OEM. Inlet Water Temp: 70˚C Outlet Water Temp: 65˚C Room Temp: 24+-2˚C (type22 Convector 600mmx 1800mm). 10 Nos.(type33 Convector 600mmx 2000mm). 04 Nos. PIPING, SUPPLY/RETURN PIPING.SITC of Heavy Duty MS Class "C" Pipes insulated with 2" thick Glass wool of density 16Kg/M³ or 1" thick Nitrile foam with aluminum cladding and including all fittings like flanges, TEE, Bends, Reducers etc.50mm. 40 mtr.40mm. 60 mtr.
Sector: PWD