Description: Construction of walling to from artificial glacier at Stok Name of Work CONSTRUCTION OF WALLING TO FROM ARTIFICIAL GLACIER AT STOK Adv cost 7 0 LACS Scheme GIA BDC Block CHUCHOT
Details: Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed::All kinds of soil Constructing vertical bunds with sloping faces, by boulder filling (dry,hand packed tightly); including cost of stones but excluding cost of wire-crates3. PROVIDING AND LAYING OF WIRE CRATE 0F 4''X 4'' MESH INL. COST OF WIRE CRATE, KNITTING ETC Head load of stone avg. Lead of 150m Head load of cement & steel avg. Lead of 2000m
Sector: RDPR