Description: L R Broq Tikat Karchey Name of Work Construction of L R from Tikat to Karchey and Tikat to Goma Broq RD 0 120 Mtr toward Goma Broq side
Details: Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth lead up to 50mtr and lift up to 1.50mtr disposed earth to be leveled and neatly dressed in: All kind of soil. All kind of soil. @60% (ii)ordinary Rock @30% (ii)Hard Rock @10%(RC) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – All work upto plinth level 1:2:4( 1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) Crushed Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:3:6 (1cement :3 course sand :6graded stone aggregate 20mm nominal size) Crushed
Sector: PWD