Description: Link road churun Tambis Name of Work Construction of Link Road Churon Tambis From RD 870 1230 at Spot Length Maintenance
Details: Earth work in excavation by manual means in trenches(Hydrulic Excavator). for foundation ,drains, pipes, cables etc. (not exceeding 1,5 mtr in width) and for shafts,wells,cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr including disposal of excavated earth upto 1Mtr from cutting edge, disposed earth to be leveled and neatly dressed in All kinds of soil. slip clearance In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 slip clearance In soils; mixed with Decomposed Rocks; by blasting or any other means Providing and laying of M.S. Pipe 300mm dia including excavation of trench and refilling of earth for cushion including cement concrete M10 grade inlet outlet ,loading unloading and Carriage complete job. Random rubble masonry with hard stone from quarry in foundation and plinth including leveling with cement concrete 1:6:12 ( 1: cement: 6 coarse sand : 12 graded stone agg, 20mm nominal size. ) at plinth level with