Description: 13 of I and FC Division Leh 2023 24 Name of Work Channelization and Flood Protection work at U S and D S of Plam bridge from Choglamsar to Phey Above and below the Spituk Pharkha Bridge Under District Plan
Details: Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed tightly); including cost of stones but excluding cost of wire crates. Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials Supply and Laying of Crate at site including carriage complete job. Carriage of Material by Mechanical Transport including loading unloading comlplete job. Stone for an avg.lead of 20 Km Carriage of Material by Head Load including loading unloading comlplete job. Stone for an avg.lead of 200 Mtr Carriage of Material by Head Load including loading unloading comlplete j
Sector: PWD