Description: Construction of link road from Saspochey to Saspochey Phoo by way of Providing and laying of 100mm thick GSB 75mm thick WMM 50mm thick BM 25mm thick OGPC and berm filling RD 0 to 1650Mtr Under Capex Name of Work Construction of link road from Saspochey to Saspochey Phoo by way of Providing and laying of 100mm thick GSB 75mm thick WMM 50mm thick BM 25mm thick OGPC and berm filling RD 0 to 1650Mtr Under Capex
Details: Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface and cleaning with mechanical broom. With rapid setting bitumen emulsion Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped
Sector: PWD