Description: Construction of Community Hall with kitchen and dinning hall at Maan Community hall Under Distt Capex Name of Work Construction of Community Hall with Kitchen and Dinning Hall at Maan Community Hall Under District Capex
Details: Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding1.5m in width or 10sqm on plan), including dressing of side sand ramming of bottoms, lift upto1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil. Ordinary Rock 20 % Providing laying of dry stone soling (any thickness) on horizontal level including cost of stone. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 20 mm nominal size derived from natural sources) Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate
Sector: PWD