Details: demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer - in- charge. demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge : demolishing brick work manually/bymechanical means including stacking of serviceable material and disposal of unserviceable material within 50metres lead as per direction of engineer-in-charge. in mud mortar earthwork in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by engineer-in-charge. all kinds of soil earthwork in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30cm in depth, 1.
Sector: RDPR