Details: earth work in excavation by mechanical means (hydraulic excavator) infoundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, includinggetting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.all kinds of soil. preparation and consolidation of sub grade with power road roller of 8 to 12tonne capacity after excavating earth to an average of 22.5 cm depth, dressing tocamber and consolidating with road roller including making good the undulationsetc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50metres. dumping stone including cost of stoen in horizontal level. providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - all work up to plinth level :1:4:8 (1 cement : 4 manufactured sand derived from recycled concreteaggregate (rca) : 8 graded stone aggregate 40 mm nomi
Sector: PWD