Details: name of work restoration of flood damage repairing of head work clearance maintenance of desalting forebay at all sites in nubra valley leh ladakh earth work in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge.(henache).(existing penstok pipe line ex
Sector: Forest and Environment