Description: Strengthening of Dathang irrigation canal at different spots between km 1st to 3rd Name of Work Strengthing of Dathang Irrigation Canal at different spots between KM 1st to 3rd Under Languishing
Details: Slip clearance In soil : Mixed with moorum /Kankar/Shingle/bolders,disposal lead up to 50m and lift up to 1.5m In Soils; Mixed with Decomposed Rock ; by blasting or any other means Demolishing cement concrete manually / by mechnical means including disposal of material wirhin 50 mtr lead 1:3:6 or richer mix Providing and laying in position cement concrete of specified grade excluding cost of centering and shuttering. All work up to plinth level 1:3:6 (1 cement: 3 course sand: 6 graded stone aggregate 20mm nominal size from natural source Randam rubble massonary with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12(1cement :6coarse sand :12 graded stone aggregate 20 mm nominal size up to plinth level with cement mortor 1:6(1cement:6coarse sand) Reinforced cement concrete work in beams, suspended floors, roofs having slopes upto 15* landings, balconies, shelves,chajjas, lintels,bands,plain window sills, stair cases above plinth level upto floor f
Sector: PWD