Description: Lanscaping at UT Lab Leh Under JJM Name of Work Landcaping at UT Lab leh
Details: Earthwork in excavation by Manual means over areas (exceeding 30cm 1.5m in width as wells as 10sqm on plan, including getting out and disposal of excavated earth, lead up to 50meters and lift upto 1.5m as directed by engineer-incharge. Supplying and stacking at site good earth Reuired colour and pattern over and including 50mm thick compacted bed of coarse sand ,filling the concrete interlocking paver block of M-30grade made by block making machine with strong vibratory compaction ,of approved size ,design &shape ,laid joints with line sand etc.all complete as per the direction of engineer -in charge. Proving and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line ,level and curvature,jointed with cement mortar 1:3(1cement :3coarse sand ),including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm)including making drainage opening wherever reuired complete
Sector: PWD