Description: Construction of MSC building Phobrang Under Distt Capex Name of Work Construction of MSC Building phobrang Under District capex
Details: Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m. Dry stone pitching (any thickness) including cost of stones. On Horizontal Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. PCC 1:4:8 (1 cement: 3 coarse sand: 8 graded stone aggregate 20mm nominal size) : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12(1cement :6coarsesand:12graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string cour
Sector: PWD