Details: earth workin excavation by manualmeans overareas (exceeding 30 cmindepth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-incharge. all kind of soil 70% hard rock 30% random rubble masonry with hard stone in foundation and plinth with mud mix. including cost of stone providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-iii) derived from natural sources : 4graded stone aggregate 20 mm nominal size derived from natural sources) steel work in builtup tubular rounded square or rectanglur hollow tube etc truss including cutting hoisting fixing in position and applying priming coat of approved steel primer including wlding and bolted with special shopped washer etc complete . providing corrugat
Sector: RDPR