Details: earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soil : dumping stone including cost of stones in horizontal on level random rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: cement mortar 1:6 (1 cement : 6 coarse sand) random rubble masonry with hard stone laid dry in foundation, plinth &walls laid without bond stone providing and laying damp-proof course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggrega
Sector: RDPR