Description: Stabilization of existing supply line by way of providing laying and fitting of pipes at blocked damaged at various spots of water supply scheme poyen Under Capex Name of Work Stabilization of existing supply line by way of providing laying and fitting of pipes at blocked demaged at various spots of water supply scheme poyen Under Capex
Details: Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: All kind of soil Providing / Laying/fitting of pipes complete including cost of pipes and required fittings as per the direciton of site Engineer incharge including all carriage complete. HDPE Pipe 40mm dia Providing and laying/fitting of GI pipes complete including cost of pipes and required fittings as per the direciton of site Engineer incharge including all carriage complete. GI Pipe 80mm dia Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidation each deposited layer by ramming and watering lead up to 50mtr and left up to 1.5m. Labour charge for re
Sector: PWD