Description: Construction of Staggered trunchs at lalung thasgam Phase II Name of Work Construction of Staggered trunchs at lalung thasgam phaseII Under the scheme PMKSY 2 0 for the year 2024 25
Details: Earth work in excavation by manual means in trenchs for foundation drains pipes cables etc over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m,including getting out excavated earth and disposal 1mtr beyound from cutting dges. of surplus excavted earth neatly dressed as directed by Engineer-in charge. Total qty=951.57. All kind of soil 70%All kind of Soil 70% Ordinary rock 30%
Sector: RDPR