Details: earth work in bulk excavation by manual means over areas (exceeding 30cm & up to 1.5mte in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth up to 50mtr from cutting edge, disposed earth to be leveled and neatly dressed.eatly dressed. all kind of soil 70% ordinary rock 20% hard rock (b.p) 10% earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: all kind of soil 50% ordinary rock 30% hard rock (r. b) 10% hard rock (b.p) 10% dumping/filling of stone in horizontal on level excluding cost of stone providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. all
Sector: PWD