Details: earth work in excavation by manual means in trench for foundation ,drains, pipes ,cables etc.(not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: ordinary rock 60% hard rock (b.p) 40% dumping/filling of stone in horizontal on level excluding cost of stone providing and laying in position cement concrete of specified grade of reinforced ceme concrete excluding the cost of centering and shuttering, all work up to plinth level :1:1.5:3(1 cement : 1.5 coarse sand (zone-iii) derived from natural source : 3 graded stone aggregate 20 mm nominal size derived from natural source reinforcement for rcc work including strainghtening cutting,bending,placing in position and binding all complete.hot rolled deformed bars hand packed stone in wire crate including cost of crate but excluding cost of
Sector: PWD