Details: excavation work in excavation by manual means in foundation trenches, drains, pipes and cables etc. (not exceeding 1.5m in width or 10sqm on plane) including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus soils and directed, within a lead of 25 mtr. all kinds of soil. all kind of soil 60% ordinary rock 40% providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) providing and laying dry stone soling duly hand packed and consolidated with hand including all carriages complete. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)mud
Sector: PWD