Details: earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. ordinary rock 40% all kinds of soil 60% filling available excavated earth (excluding rock) in trenches plinth, sides of foundation etc in layer not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, lead upto 50cm and lead up to 50 m and lift upto 1.5 mtr. stone solling supplying and stacking of stone for solling including cost of stone (in horizontal on level) concrete work providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering. all work upto plinth level 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) (crushed)
Sector: PWD