Description: Completion of Balance work of Upgradation of Link Road Darchiks Name of Work Completion of Balance Work of Upgradation of L R Darchiks Under Capex
Details: Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge. All kind of soil @ Soft Rock @ Hard Rock (Blasting Prohibited) @ Earth work in excavation by manual means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kind of soil. All kind of Soil @ Providing and laying in position cement concrete of specified grade including curing but inclcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coar
Sector: PWD